|
|
|
|
|
|
|
|
|
Students grouped on the land reclaimed from material dredged from the river estuary. |
|
|
|
|
|
|
|
|
|
|
|
|
Listening to the site engineer telling them about the construction of the new dock at Felixstowe. |
|
|
|
|
|
|
|
|
|
|
|
|
Looking at the stockpile of steel tubes which will be used as piles for the sea wall of the dock. |
|
|
|
|
|
|
|
|
|
|
|
|
Standing on the hard area which lorries will use. The area was being paved with small concrete blocks. |
|
|
|
|
|
|
|
|
|
|
|
|
A welcomed break before setting off in the coach to the next site visit. |
|
|
|
|
|
|
|