|
|
|
|
|
|
|
|
|
Students lining up for their group photograph before being taken around the construction site for the new entrance to Stansted Airport off the M11. |
|
|
|
|
|
|
|
|
|
|
|
|
Small group being shown part of the earthworks by an engineer from May Gurney, the civil engineering contractors on the site. |
|
|
|
|
|
|
|
|
|
|
|
|
Same group being shown more of the earth works. |
|
|
|
|
|
|
|
|
|
|
|
|
Overlooking the construction of the new slip road off the south bound carriageway of the M11 |
|
|
|
|
|
|
|
|
|
|
|
|
The new flyover on the slip road off the north bound carriageway of the M11 can be seen in the background |
|
|
|
|
|
|
|
|
|
|
|
|
Standing on the new slip road off the south bound carriageway of the M11. |
|
|
|
|
|
|
|
|
|
|
|
|
Standing underneath the flyover of the slip road from the north bound carriageway of the M11. |
|
|
|
|
|
|
|
|
|
|
|
|
Steel cross beams on the new flyover. |
|
|
|
|
|
|
|
|
|
|
|
|
Walking back to the coach. The new flyover can be seen in the background with traffic on the M11 passing underneath it. |
|
|
|
|
|
|
|
|
|
|
|
|
To the left of the group is the new slip road off the south bound carriageway of the M11, with the flyover on the north carriageway slip road in the distance. |
|
|
|
|
|
|
|
|
|
|
|
|
The new slip road off the south bound carriageway heading towards the Birchanger Roundabout. |
|
|
|
|
|
|
|
|
|
|
|
|
Construction of an underpass on the south bound slip road. |
|
|
|
|
|
|
|
|
|
|
|
|
Vibrating roller for compacting the soil and other material. |
|
|
|
|
|
|
|
|
|
|
|
|
Concrete crusher breaking up reclaimed concrete from the site. |
|
|
|
|
|
|
|